英语缩略词“CP”经常作为“Central Pit”的缩写来使用,中文表示:“中心坑”。本文将详细介绍英语缩写词CP所代表英文单词,其对应的中文拼音、详细解释以及在英语中的流行度。此外,还有关于缩略词CP的分类、应用领域及相关应用示例等。
“CP”(“中心坑)释义
- 英文缩写词:CP
- 英文单词:Central Pit
- 缩写词中文简要解释:中心坑
- 中文拼音:zhōng xīn kēng
- 缩写词流行度:190
- 缩写词分类:Medical
- 缩写词领域:British Medicine
以上为Central Pit英文缩略词CP的中文解释,以及该英文缩写在英语的流行度、分类和应用领域方面的信息。
英文缩略词CP的扩展资料
-
The force of load was the truth data measured in each tooth. Results : Central pit in the maxillary first molar was interfered with strain and stress had increased evidently in compare with balance occlusion from whole base plate.
结果:对上颌总义齿右上第一磨牙中央窝造成干扰后,与平衡(牙合)比较,从整个基托来看,应力应变都有明显增加。
-
The arrangement of the length of soil nailing has great influence on the deformation of foundation pit. Therefore, the design schemes of setting long soil nailing in the central of foundation pit and in the upper of foundation pit are preferably better.
土钉长度的布置方式对基坑变形有较大影响,基坑中部土钉长的设计方案和基坑上部土钉长的设计方案较好。
-
Piles have a certain resilience, the largest resilience occurred on center pile, and the largest soil rebound occurred at central area of pit.
基桩均出现一定回弹,中心桩最大,基坑中心区域土体回弹量较大。
-
Study on Construction Technology of Central Island Brace for Super-large Foundation Pit
特大型基坑采用中心岛斜支撑法的施工技术研究
-
So seepage is the central problem in the cause of excavation. Taken the pit excavation as an engineering example in this paper, pit seepage is studied including saturated line and seepage discharge, and excavation slope stability is discussed induced by seepage.
本文以该厂房基坑开挖为工程背景,对开挖过程中基坑渗流进行研究,分析稳定渗流时的浸润面、基坑渗水量,并对由渗流引起的开挖边坡稳定性问题进行了探讨。
上述内容是“Central Pit”作为“CP”的缩写,解释为“中心坑”时的信息,以及英语缩略词CP所代表的英文单词,其对应的中文拼音、详细解释以及在英语中的流行度和相关分类、应用领域及应用示例等。