The infrastructure plan is based on the results of the gap analysis and on the project budget. 基础设施计划是基于差异分析和项目预算的。
One of the areas focused upon is a fit / gap analysis of how close the packaged application comes to satisfying the project requirements. 其中焦点之一是对打包应用软件满足这个项目需求的程度进行分析。
The gap analysis is important, because it is the basis for your data warehouse project proposal and design. 差异分析十分重要,因为它是您数据仓库项目建议和设计的基础。
Based on these factors, the gap analysis method is studied in detail, and is applied in a real project. 最后应用差距分析法对影响协同的关键因素进行分析,并给出具体的应用实例。