Key Points of Construction Quality Control of Precasting 60-m Full Span(FS) PC Box Girders for Qingdao Bay Bridge 青岛海湾大桥60m预应力混凝土箱梁整体预制施工质量控制要点
If the full span wall is on the transfer beam, they could work together; 当转换梁上作用非满跨剪力墙时,受力状态比较复杂,梁和墙部分共同工作;
Studying of Precasting and Management of Full Span(FS) Box Girder 整孔箱梁预制施工技术研究
In continuous composite slabs, the shear span is determined based on the assumption that the sagging region length of a continuous composite slab equalizes to the full span of a simply support slab. 对于连续组合楼板,可采用连续跨中正弯矩区的长度与简支楼板跨度等效的原则进行剪跨计算。
For a secondary bifurcation buckling load, the limit load carried capacity of the arch of 0.1 rise-span ratio is the biggest one under a full span load distribution. 全跨均布荷载作用下,矢跨比0.1的拱极值点屈曲和二次分岔屈曲极限承载力均大于其他拱。