The middle wall waterproof and drainage system is a key process in multi-arch tunnel, it controls the efficiency of waterproof and drainage in tunnel and total quality in the construction of tunnel. 中隔墙作为连拱隧道的中枢结构和重要承载构件,其受力及位移情况往往对工程成败和安全起着决定性作用。
Been performed to verify the total quality control of construction quality control of water projects feasible and reasonable. 经过分析验证了全面质量控制对建筑防水工程质量控制的可行性与合理性。
This will help deepen the innovation of the theory, and gradually establish and improve the theoretical framework adapting to total quality management system construction in the new situation, promoting study of the innovative library management theory. 这将有助于深化图书馆管理创新的理论研究,逐步建立和完善适应新形势下的图书馆全面质量管理体系构建的理论框架,从而推动图书馆管理创新理论的深入研究。
Total Quality Management of Construction of Asphalt Concrete Pavements 沥青混凝土路面施工的全面质量管理
Based on this, take the lean manufacture thought as the master line, the utilization lean manufacture improvement technology, from aspects and so on underwriter, punctual production, Total Quality Management, organization construction, informationization system carries on the redesign. 在此基础上,以精益生产思想为主线,运用精益生产改进技术,从成组技术、准时生产、全面质量管理、组织架构、信息化系统等方面进行重新设计。