Following the completion of the integrated system checkout, supplier shall demonstrate the system to company at a factory acceptance test. 综合系统测试完成之后,供应商应在工厂验收测试时向公司演示该系统。
The masts will be packed and loaded after the factory acceptance test in the factory onto a lorry or train, depends on the location where the factory are and the destination store will be. 根据工厂所在地和储存地点,在工厂验收试验(FAT)试验后将支柱装箱于货车或火车。
The factory acceptance test ( FAT ) and site acceptance test ( SAT ) of distribution automation system should be done before system putting into operation in order to ensure the product's quality. Especially, feeder automation ( FA ) testing is the key process. 为保证配电自动化产品在用户验收阶段的产品质量,需要进行出厂试验(FAT)与现场试验(SAT),其中,馈线自动化测试是配电自动化系统试验的关键。