On our most projects Critical Path Method(CPM) ( CPM ) is used for scheduling. 在我们的大多数工程项目中都采用统筹法(关键路线方法,简称CPM)排计划。
Through the use of critical path method and the process of mapping network model, analyse the progress of activities, optimize the process model for the goal of the cost and time. 通过运用关键路径法(CPM)和绘制网络图对过程模型中活动进度安排进行分析,并且以时间-成本为目标对过程模型进行优化。
The critical path method was originally developed to solve scheduling problems in an industrial setting. 关键路线方法最初的发展是为了解决一项工业安装的安排问题。
Based on critical path method authors provide improvement method on progress compilation methods of flow process without steps which gains satisfying effect. 基于关键路线法提出了无节拍流水施工进度计划编制的改进方法,取得了满意的效果。
Apply critical path method to manufacturing, combine with CAD / CAM technology, the AOE net model is established in which take machine as node and assign task to machine according to process flow. 将关键路径法(CPM)具体应用于机械制造业,结合CAD/CAM技术,建立以机床为结点按工序流分配任务的AOE网络模型。