An indication of implementation cost in terms of frequency of activity, calendar time, and man-hours per iteration. 指出实施成本根据活动的频率,日历时间(CT),和工时。
A project schedule is created by assigning resources and determining the calendar time required for each task. 分配资源,确定每项任务所需的时间,制定项目进度计划。
As if floating calendar time to time like to save rather than save. 犹如时光浮历,来时似以存而非存。
The economic developments that really matter now take much longer to unfold – economic time has slowed down relative to calendar time – and yet the planning horizons of economic agents have shortened. 现在,真正重要的经济发展成果需要更长的时间才能够显现相对于日历时间(CT),经济时间已经放慢下来但经济要素规划的时间周期却在缩短。
The transformation from calendar time to economic time is so called time deformation. 这种从日历时间(CT)到经济时间的变换类似于坐标变换,称为时间变换。