Furthermore, a project budget and Cost Breakdown Structure(CBS) are developed and mapped to the OBS and WBS. 此外,专案的预算与成本分解结构(CBS)也须加以发展并与OBS和WBS作对应。
At the same time, cost sort form should be a system at some length also and possess the favorable homography with the basic tool of cost planning & Work Breakdown Structure. 同时,成本的分类构成同时也是一个很详尽的计划系统,与成本计划的基本工具&项目结构分解(WBS,WorkBreakdownstructure)有着良好的对应性。
Pls show me the cost breakdown to identify your cost structure. 请给我你们的费用分解表,以识别你们的费用结构。
Getting along with engineering, dynamic cost control is the key of the cost control in construction phase. And breakdown structure of the cost is the base of the cost control. 随着工程的进展,动态的对投资进行控制是施工阶段投资控制的关键,而投资分解结构又是整个投资控制的基础。